ICS one piece, soft nose walk in box. The box is assembled, condensing unit and evaporator mounted at the factory, and shipped on a flatbed. A crane is used to offload. Once the box is set, flashing is installed and an electrician starts up the system. In all, it typically is less than half a day of labor.